Every drydock, run as a project, driven by AI agents.

From the class survey window to the purchase order: scope, schedule, budget, approvals and vendors in one place, 180 days before the yard.

D-180 The agent opens the project 6 months before the docking anniversary
ABS Class rules built in: 5-year cycle, 36-month maximum interval
FLEET Consolidated purchasing across dockings: scale instead of urgency
CASH Cash flow balanced across years, before it becomes a surprise
Stabbert Maritime

Sign in

Role-based access: Maintenance, Procurement, Operations, Charters, Finance and Executive.
Demo: click Sign in to browse as Technical Director. Inside, the Guided tour button explains every screen in 2 minutes.
Demo · Reta Analytics View the presentation →
Stabbert Maritime DRYDOCK COMMAND CENTER
DEMO
Sign in as (access demo)
Drydock Command Center · Friday, August 28, 2026

Good morning. The fleet has 1 critical window and 2 decisions waiting on you.

Briefing prepared by The Chief at 06:00 · sources: PMS, class registry, AIS, finance
180DAYS
Ocean Guardian has entered the D-180 drydock window

Class due date February 2027 (Special Survey + docking). The Chief has already drafted scope, schedule and a preliminary budget: it is waiting for your approval.

Fleet live map

real positions · public AIS · Aug 28, 2026
real AIS position ▲ under way ▲ docking window open no AIS (barge)
The Chief · daily brief for the Technical Director

    Drydock spend · 2027 and 2028

    current plan · illustrative figures
    scheduled drydock routine maintenance The agent proposes rebalancing: see Financial & cash
    Demo prepared for Stabbert Maritime · operational and financial figures are illustrative · Reta Analytics · August 2026
    Operations · Fleet & windows

    Fleet & class windows

    7 vessels in this demo · rule applied: ABS Part 7 + IACS UR Z3/Z7, always the strictest

    Docking timeline · 2026 to 2031

    cell = half-year · red = drydock
    completed / committed drydock planned drydock class window open in compliance deployed / project

    Vessels

    registry + AIS + class data
    VesselRegistryTypePosition (AIS)Last drydockWindow untilWindow consumed (36 mo)
    IMO, MMSI and build years are real public registry data (Aug 28, 2026) · docking dates and survey status are illustrative (they live in the operator's own records)
    Ocean Guardian drydock · D-180 · project DD-2026-OG

    Ocean Guardian · class renewal drydock

    Special Survey + docking · class window until Feb 2027 · dock entry planned Oct 19, 2026 · 18 days
    Scope items
    22
    12 class · 6 planned · 4 corrective
    Proposed budget
    $1.92M
    12% contingency included
    Days on dock
    18
    critical path optimized (was 23)
    Critical purchases
    2
    PO by Sep 12 (75-day lead)
    Suggested yard
    SMI · Ballard
    your own yard · freshwater berth · slot open

    Work list · prioritized by the agent

    sources: ABS class + PMS + weekly fleet call
    Class · mandatory (ABS Special Survey)
    P1Docking, block arrangement and high-pressure washprerequisite for the entire hull scopeclass$395k
    P1UT gauging of hull and tanksclassafter wash$88k
    P1Overhaul of both propulsion thrustersimported seal kits · 75-day lead · critical POclassparts D-75$420k
    P1Sea valves and overboards: open, machine, pressure-testclasson dock$122k
    P2Anchors and chain: range, gauge and re-markclasson dock$46k
    Planned · accumulated from the PMS
    P2Full paint system: anticorrosive + antifoulingplannedafter UT$340k
    P2Renew sacrificial anodes (hull + sea chests)plannedwith paint$64k
    P2Overhaul seawater pumps and coolersplannedparallel$96k
    Corrective · reported by the crew (weekly fleet call)
    P2Vibration on the stbd generator bearingreported Aug 12 · chief engineercorrectiveparallel$52k
    P2Repair bilge alarm and level sensorscorrectiveparallel$21k
    + 12 more items in the full scope · every item traceable to its source (class rule, PMS routine or crew report) Total: $1,920,000

    Critical path · 18 days on dock

    D = dock entry Oct 19
    D-120D-60D-30DD+4D+9D+13D+18
    Yard slot booking SMI Ballard
    done
    PO thruster seal kits imported · 75 d
    75-day lead
    Mobilization Anacortes → Seattle
    8 h
    Docking + wash + UT
    4 d
    Thruster overhauls
    8 d
    Paint + anodes
    6 d
    Sea valves + ABS survey
    5 d
    Refloat, trials and redelivery
    4 d
    critical pathparallelcomplete

    How the agent built this scope

    1 Read the class due date in the registry and opened the project at D-180
    2 Crossed PMS routines coming due with the history of the last 2 drydocks
    3 Pulled crew-reported corrective items that require the dock
    4 Ordered everything by precedence and built the 18-day critical path
    5 Priced each item from fleet history and previous quotes
    Illustrative figures · 10 of the 22 scope items shown
    Drydock · Financial & cash

    Drydock cash flow

    Projected monthly spend · 2027 and 2028 · illustrative figures
    2027 concentrates 3 drydocks while 2028 has only 1.

    Ocean Titan's class window allows docking as late as Feb 2028 without touching the due date (36 months from her last docking), and she is deployed on charter in the Western Pacific until Q4 2027. Moving her drydock from Nov 2027 to Feb 2028 relieves $2.3M of 2027 cash, satisfies the one-docking-per-half-year constraint and keeps class compliance at 100%.

    2027 spend
    $5.65M
    3 drydocks
    2028 spend
    $0.95M
    1 drydock
    Peak cash in one half-year
    $4.05M
    2027 · 2nd half
    1 dock / half-year rule
    violated
    2 drydocks in H2 2027

    Monthly spend · current plan

    drydocks + routine maintenance
    drydock drydock moved by the agent routine

    Drydocks in the plan

    current plan

    Rules the agent respected

    Class window: no docking beyond the 36-month limit (ABS/IACS)
    Operational rule: at most 1 drydock per half-year
    Charter commitments: no docking during a committed deployment
    Cash: half-year peak below the ceiling set by Finance
    i Ceilings and constraints are configurable by leadership in Constraints
    Illustrative figures · in production the agent reads the actual ledger and historical yard invoices
    Drydock · Constraint engine

    Docking plan constraints

    The agent only proposes plans that satisfy every active rule · conflicts are surfaced with alternatives
    class36-month window

    Maximum interval between dockings (ABS Part 7 · IACS UR Z3). Cannot be switched off.

    exceptional extension: +3 months
    operations1 drydock per half-year

    Avoids overlapping crews, parts and fleet downtime.

    set by leadership · active
    financeHalf-year cash ceiling

    Maximum drydock spend within a single half-year.

    $2.5M / half-year
    chartersDeployment lock

    No docking scheduled while a vessel is on committed charter.

    checked against the charter book

    Conflict detected: 2 drydocks in H2 2027

    Ocean Lee (Aug 2027, class due) and Ocean Titan (Nov 2027, planned) violate the one-docking-per-half-year rule and the half-year cash ceiling ($4.05M > $2.5M). Titan is also still deployed in the Western Pacific. The agent evaluated 6 valid combinations and highlighted the best 2:

    Option A · move Ocean Titan to Feb 2028
    • Class window respected (limit: Feb 2028; Special Survey due Apr 2028)
    • One drydock per half-year across the whole plan
    • 2027 cash relieved by $2.3M; half-year peak drops 43%
    • Returns from the Pacific deployment with no early demobilization
    Option B · keep Nov 2027 and relax the rule
    • Requires leadership approval for 2 drydocks in the half-year
    • $2.3M of additional cash concentrated in 2027
    • Early demobilization from the Pacific charter (penalty exposure)
    • No class benefit: the due date remains Apr 2028

    How the engine decides

    On every change (a new corrective item, a vendor delay, a window update), the agent re-evaluates the entire fleet plan: each vessel's class window, cash per half-year, yard slot availability and charter commitments. If every rule passes, the plan stands. If one breaks, it presents alternatives ranked by total cost, including the off-hire cost of $38k/day per vessel out of service. The final call is always human.
    Rules and ceilings are configurable · the class rule is inviolable by design
    Ocean Guardian drydock · Approvals

    Approval chain · DD-2026-OG

    Scope + budget of $1.92M · submitted by the agent on Aug 28, 2026 at 9:14 AM
    Port Engineer · technical scopemaintenance planning · Aug 28, 9:14 AM
    Fleet Managerapproved · Aug 28, 11:32 AM
    3Technical Directorwaiting on you
    4CEOreleases purchase orders

    What is being approved

    Scope22 items 12 class · 6 planned · 4 corrective
    Budget$1,920,000 12% contingency included
    Dock periodOct 19 to Nov 6, 2026 18 days · SMI · Ballard, Seattle
    Critical purchases2 import POs released after CEO approval
    Operational impactCoverage confirmed work re-assigned across the fleet

    Audit trail

    everything on record
    Aug 28, 6:00The Chief assembled scope v3 (2 new corrective items from the weekly fleet call)
    Aug 28, 9:14Port Engineer validated the technical scope and per-item budget
    Aug 28, 11:32Fleet Manager approved with no reservations
    Aug 28, 11:33Technical Director notified (e-mail + SMS)
    Approval levels configurable by amount and type · nothing is purchased without the full chain
    Drydock · Procurement & quotes

    Procurement & quotes

    After CEO approval the agent issues POs and work orders, e-mails registered vendors and chases the replies
    POs / WOs issued
    11
    Ocean Guardian drydock
    Quotes received
    8/11
    automatic follow-up active
    Price deviation alerts
    1
    anodes: +18% vs history
    Lead-time risks
    1
    thruster seals · 75-day lead

    Quotes in progress

    deviation vs fleet history · alert threshold: 10%
    DocumentItemVendorBudgetedQuotedDeviationLead timeStatus
    PO-2026-114Zinc anodes · hull + sea chestsPacific Marine Supply$64,000$75,500+18.0%25 d ✓above threshold
    PO-2026-114bZinc anodes (agent's alternative quote)Sound Anode Works$64,000$62,700-2.0%20 d ✓recommended
    PO-2026-109Thruster seal kits (import)OEM · US distributor$268,000$278,700+4.0%75 d ⚠issue PO by Sep 12
    WO-2026-231Blasting, paint and anodes (dock services)SMI · Ballard$405,000$396,200-2.2%on dock ✓within budget
    WO-2026-233Sea valve seat machiningDelta Marine Works$122,000pendingfollow-up sent today

    E-mail activity · automatic

    mailbox procurement@stabbertmaritime.com
    PO-2026-114 sent to 3 vendorszinc anodes · spec sheet and quantities attached
    Aug 25, 8:02
    Quote received · Pacific Marine Supplyread by the agent · +18% deviation detected and flagged
    Aug 26, 14:47
    Alternative quote requested · Sound Anode Workstriggered automatically by the deviation alert
    Aug 26, 14:52
    Quote received · Sound Anode Works · $62,700within budget · recommended to the buyer
    Aug 27, 10:15

    Fleet view: consolidated purchasing

    Before quoting, the agent looked at every drydock in the next 18 months. Buying together instead of vessel by vessel:

    Zinc anodes · 4 drydocksGuardian + Valor + Lee + Titan · 2.4 tsaves $31k (-12%)
    Antifouling paint · 3,800 galsame coating system across 4 drydockssaves $54k (-9%)
    Vendors and figures are illustrative · in production the agent uses the real vendor registry and PO history
    Ocean Guardian drydock · Team & mobilization

    Technician & specialist logistics

    Who needs to be dockside, coming from where, on which day · the agent cross-checks the fleet's other drydocks to avoid specialist clashes

    Specialist clash detected

    The OEM-certified thruster engineer (the only one qualified for the overhaul) is booked on Ocean Guardian Oct 23 to Nov 1 and also on Ocean Valor's drydock planned for May 2027. No clash in this cycle, but the agent has already blocked his calendar for both windows and will alert you if either docking moves.

    Mobilized team · 18 days on dock

    8 professionals · 3 companies

    Mobilization cost

    included in the drydock budget
    Flights
    $18,400
    Lodging
    $33,600
    Per diems
    $26,200
    Total
    $78,200
    Fleet view: if Ocean Valor docks in the same window next spring, the same paint and steel crew covers both projects, with an estimated $34k saved in mobilization.

    How the agent staffs the dock

    1 Reads the approved scope and flags items that require certification (thrusters, welding, NDT)
    2 Checks who in-house is qualified and who must come from outside (OEM, contractor)
    3 Schedules each professional for the day their task starts, not day one
    4 Cross-checks clashes with the fleet's other drydocks over the next 18 months
    5 Prices flights, lodging and per diems into the drydock budget
    Company names and figures are illustrative · in production the agent reads the real vendor registry and crew roster
    Fleet · Equipment & running hours

    Onboard equipment

    Each vessel has its own configuration · running hours are the automatic trigger for drydock work items

    Equipment

    hours until next intervention

    What became a drydock item

    generated by running hours

    Trigger rule

    Every piece of equipment carries a manufacturer service interval (in running hours) and a drydock flag: items that can only be done out of the water enter the scope automatically when the hour projection lands inside the dock window. Past 85% of the interval, the agent flags it; past 100%, the item becomes mandatory and moves to the top of the priority list.
    below 70% 70% to 85% above 85%, enters the scope
    Equipment configuration is illustrative, based on comparable OSVs and research vessels · in production it comes from each vessel's actual registry (Kimberly C's EMD 16-645E2 and Intercon winch are from the public spec sheet)
    Intelligence · Alerts & recipients

    Who gets told, about what, on which channel

    Rules configurable by leadership · the agent fires e-mail and SMS automatically to the right people

    Active rules

    click a switch to turn it on or off

    Alerts fired in the last 7 days

    full log
    WhenAlertRecipientsChannel
    Aug 28, 6:00Ocean Guardian entered the D-180 windowproject DD-2026-OG created automaticallyMaintenance, Operations, Leadershipe-mail + SMS
    Aug 28, 11:33Approval pending for 2hDD-2026-OG waiting on the Technical DirectorTechnical DirectorSMS
    Aug 26, 14:47Quote deviation: +18%zinc anodes, Pacific Marine SupplyProcurement, Leadershipe-mail
    Aug 26, 14:52Alternative quote requestedautomatic action by the procurement agentSound Anode Workse-mail
    Aug 24, 6:00Thruster hours past 85% of intervalOcean Guardian · both units · auto-added to scopeMaintenance Planninge-mail

    Registered recipients

    by department
    Maintenance Planningmaintenance@stabbertmaritime.com6 rules
    Procurementprocurement@stabbertmaritime.com5 rules
    Operationsoperations@stabbertmaritime.com4 rules
    Charterscharters@stabbertmaritime.com2 rules
    Financefinance@stabbertmaritime.com3 rules
    Technical Directore-mail + SMSall
    CEOapprovals and weekly summary only2 rules
    E-mail addresses are illustrative · nothing is actually sent from this demo
    Intelligence · Reports

    Reports · generated by The Chief

    Every department gets its own: Executive, Procurement, Operations, Charters or Finance · on demand or scheduled
    Demo document with illustrative data
    The Chiefdrydock agent · scenario simulator
    Good morning. I am tracking 7 vessels, with 1 critical window (Ocean Guardian) and 1 plan conflict in 2027. I can simulate any docking scenario for the fleet: ask me anything, or use the shortcuts below.
    Stabbert Maritime demo

    Welcome to the Drydock Command Center

    This is the system that runs every drydock as a project, with AI agents doing the heavy lifting: scope, schedule, budget, approvals and purchase orders.
    Your real fleet7 Stabbert vessels, with registry data and live AIS positions
    7 access rolesfrom the CEO to the buyer, each with their own view
    Fully interactiveapprove, rebalance cash, generate reports
    Fleet and registry data verified in public sources · financial figures are illustrative